I hope everyone is getting ready to enjoy the great weather and the long weekend. The construction crew at the aquatic centre are all looking forward to a long weekend. I noticed that there seemed to be a lot of workers around so I asked someone and was told that there were over 70 people working here on a daily basis! It's amazing how much of a difference it has made, things are rolling along at a good clip.
The first photo in todays series is showing the start of the tiles being installed in the shallow end of the lap pool.
The second photo also shows some tile work in the lap pool. these fellows are working in the deep end of the lap pool and tiling around one of the under water lights.
The image above was taken from the shallow end of the lap pool towards the east end of the complex. You can see mechanical room, main floor being framed in and to the right of the framing are the steam room and sauna. The benches in the steam room are being formed up for concrete and will ultimately be tiled.
The final photo today is a picture of one of the ultra violet disinfection chambers. There will be 3 of these units, one each for the lap pool, leisure pool and swirl pool. These units along with the addition of chlorine will keep our water disinfected.
Thanks again for your your continued interest. We'll be back next week for another update. Have a great long weekend!