I started this blog on friday and couldn't get back to it until this morning. Here are some more photos showing the progress of construction of the Cowichan Aquatic Centre. This first photo is one of the water features in the wave pool. Each of these pipes delivers a different stream of water. One flows out of the end like a steam of water, one has multiple nozzles on the top and sprays up, the last one is made to have the flow run out along the length of the pipe like a small waterfall.

This next photo shows the wave pool from the slide tower. You will notice the features and the blue wall in the background.

I put the photo below in to show you colour of the feature wall in the fitness area. I was dubious of the choice initially, but it turned out to be really effective.

The final photo is an outside shot of the entrance way between the Cowichan Community Centre and the Cowichan Aquatic Centre.

Thank you for your interest. I'll have more for you later this week.


Posted by Picasa

Friday, June 6, 2008

let there be light

Hello again,

Here are some new photos for your enjoyment. The first one is the start of the construction of a storage area on deck at the deep end of the lap pool. You can see where the wall juts to the left and if you look where the wheelbarrow and blocks are you will see where the diving boards will be situated.

The next photo shows the last section of the red water slide being bolted together. The only things left to do now are to hook up the water supply to the slide and add the controls.

This next photo shows the lights in the pool area being turned on for the first time. The clusters that you see in the photo are the coloured lights that will highlight the features and add some ambience to the space.

The final photo is the start of the landscaping work for the entrance to the pool. Landscaping is going on on three sides of the building at the moment and will be ongoing for a while yet.

Thanks for your interest. Have a good week and I'll have some more information and photos up at the end of the week.

Posted by Picasa

Thursday, May 29, 2008

May 29/08

Good afternoon,
Welcome to the Cowichan Aquatic Centre construction blog.
Below are 4 photos that give you an idea of progress on the construction of the new aquatic facility that we are building.
The first photo highlights the mural that is being created on the east wall inside the pool area.

The photo below is of the elevator that is being put together onsite now. So far we have have 3 walls and a floor and ceiling!

This next photo is taken from the slide tower and shows the lazy river with the spray arch and manufactured rock work.

The final photo this week is of our swirl pool. as you can see the tiling is almost complete and the tilers have moved to the lazy river.

Thank you for your interest. Have a good day.
Posted by Picasa

Friday, May 23, 2008

May 23/08

Good day folks,
It's a lovely almost sunny day here in the Cowichan Valley. This week we have a mix of photos from different parts of the construction site.
The first photo shows the coloured lighting that is suspended over the leisure pool to give some ambience and highlight some of the features in the leisure pool area.

The second shows a hint of the mural that will eventually span the entire east wall of the pool area. This section is in the corner where the slides are located and gives you a taste of the rain forest theme that will dominate the facility.

The third photo shows a bunch of styrofoam blocks on the deck and walls of the lazy river. These blocks are the infrastructure of the decorative rock work that is being made around the decks.

In the last photo you can see the formed rock work in the foreground. These are hand made, built on the styroam blocks.

Enjoy your weekend. Back next week with more..

Posted by Picasa

Friday, May 16, 2008

Cowichan Aquatic Centre in May

Good Morning,
I hope everyone is getting ready to enjoy the great weather and the long weekend. The construction crew at the aquatic centre are all looking forward to a long weekend. I noticed that there seemed to be a lot of workers around so I asked someone and was told that there were over 70 people working here on a daily basis! It's amazing how much of a difference it has made, things are rolling along at a good clip.

The first photo in todays series is showing the start of the tiles being installed in the shallow end of the lap pool.

The second photo also shows some tile work in the lap pool. these fellows are working in the deep end of the lap pool and tiling around one of the under water lights.


The image above was taken from the shallow end of the lap pool towards the east end of the complex. You can see mechanical room, main floor being framed in and to the right of the framing are the steam room and sauna. The benches in the steam room are being formed up for concrete and will ultimately be tiled.

The final photo today is a picture of one of the ultra violet disinfection chambers. There will be 3 of these units, one each for the lap pool, leisure pool and swirl pool. These units along with the addition of chlorine will keep our water disinfected.
Thanks again for your your continued interest. We'll be back next week for another update. Have a great long weekend!
Posted by Picasa

Thursday, May 8, 2008

next..

Good morning,
We are moving into new territory now with the outside road work and landscaping starting up. The first area that is being worked on is the entrance between the Cowichan centre and the Cowichan Aquatic Centre under the big stick. The work here is working on the drainage and bringing up the level of the driveway to match the two facilities and create a nice transition between the two facilities. The photo below shows where we are at now.

The next photo shows the heat exchanger for the lap pool on the main floor ceiling of the mechanical room.


This photo shows the heat exchanger for the leisure pool which is mounted over the backwash tank, also located on the main floor ceiling in the mechanical room.

The final photo today shows the swirl pool with all of the decks and benches poured, not quite ready for swimming in but, the infrastructure is now in place.

And so construction continues, lots of drywall being installed in the entrance way, change areas and in the pool areas, the air handling equipment is now being assembled in the mechanical room, and the lap pool is being prepared for the tiling to begin, and the slide components have arrived on site and are being assembled as I write. We've come a long way baby! Still lots to do, i'll keep you in the loop in the upcoming weeks. If there is anything specific that you would like to see or ask about, please respond to this post and I'll be happy to respond.Until next, have a good day.
Posted by Picasa

Friday, April 25, 2008

Cowichan Aquatic Centre today

Good afternoon everyone,
I hope that you have all had a pleasant and productive week. I have, although I'm still looking forward to the weekend. Maybe it won't snow and I can get the lawn cut!
This week on the construction site more concrete was poured around the swirl pool and tots pool. The photo below shows the freshly poured deck in front of the swirl pool.

The next photo shows the same area from a different angle. Here you can see where the sauna & steam room will be with the swirl pool on the extreme left of the photo. The next step will be to start constructing the sauna & swirl pool rooms.

The last photograph (below) is of the lower meeting rooms which will be used for birthday parties, aquatic courses, meetings, and more. At the far right side of the photo will be the cafe area on the inside and ondeck viewing on the outside.

The final photo today is one part of the ducting on the air handling units that will treat 1/2 of the pool area. This part of the duct that comes out of the top of the one of the units is about 4 feet in diameter! this unit will treat the wave pool side of the building and an identical one will treat the lap pool side. That's a lot of hot air!

Have a good weekend and don't forget about the grass!(change the oil in your lawn mower before using it for the first time, or at least check the level and top it up).
Posted by Picasa