Good morning,
We are moving into new territory now with the outside road work and landscaping starting up. The first area that is being worked on is the entrance between the Cowichan centre and the Cowichan Aquatic Centre under the big stick. The work here is working on the drainage and bringing up the level of the driveway to match the two facilities and create a nice transition between the two facilities. The photo below shows where we are at now.
The next photo shows the heat exchanger for the lap pool on the main floor ceiling of the mechanical room.
This photo shows the heat exchanger for the leisure pool which is mounted over the backwash tank, also located on the main floor ceiling in the mechanical room.
The final photo today shows the swirl pool with all of the decks and benches poured, not quite ready for swimming in but, the infrastructure is now in place.
And so construction continues, lots of drywall being installed in the entrance way, change areas and in the pool areas, the air handling equipment is now being assembled in the mechanical room, and the lap pool is being prepared for the tiling to begin, and the slide components have arrived on site and are being assembled as I write. We've come a long way baby! Still lots to do, i'll keep you in the loop in the upcoming weeks. If there is anything specific that you would like to see or ask about, please respond to this post and I'll be happy to respond.Until next, have a good day.
Thursday, May 8, 2008