Thursday, January 31, 2008
Progress Everywhere!
Wednesday, January 23, 2008
Jan 23/08 - Swirl Pool
Wow, does the sun ever feel good today. Well, that's a good excuse to go outside and soak up some rays and check on progress at the new facility.
And, that's just what I did! I think everyone is working here today, there are tradesmen everywhere in the facility, some up high working on steel walls and waterlines, some at floor level working on plumbing and forms, and more outside working on windows.
I have been watching the progress on the Swirl Pool and I thought that this would be a good theme for today. The First photo was taken on Jan 14 when work started on building up with insulation to provide a base for the plumbing. Here you can see the main drains piped in and the blocks building up around them.
In the next photo, taken Jan 17, you will notice that the blocks have all been installed and the reinforcing bar is being put in for the concrete. There is still some plumbing to do first though.
In this last photo taken today you can see that there is more plumbing and reinforcing as they prepare for the concrete. You'll also notice the expansion joint being placed around the perimeter. We're almost ready for the concrete. Which we hope to do later this week.
Until next time, enjoy the sunshine while it's here.
Saturday, January 19, 2008
Moving the Air Handling Units
I showed up at the pool around 12noon, at that point they had transitioned the first air handling unit to the main pool deck from outside. Over the course of the next three hours this unit then made its way, through excellent communication from all those in attendance and a steady hand on the crane controls to the second story.
Thursday, January 17, 2008
Air Handling units
Good Morning folks,
This weeks focus is on the two large air handling units that will be moved from their present location outside the facility (above photo) to their destination on the second floor of the mechanical room. You can see how big these units are if you look at the truck parked in front of them.
Wednesday, January 9, 2008
Jan 9/08 - Working on the Roof
Monday, December 24, 2007
Friday, December 21, 2007
Deck work on the Competition Pool
Hi Folks,
There's lots of activity on the construction site today. One of the highlights so far is the big cement boom truck that came in and poured cement for the decks around the competition pool.
The cement truck lines up behind the pumper truck and connects to the pump and the pumper reaches over and through the window slot to direct the cement to the deck area. The crew then spreads, smoothes and levels the cement to form the deck around the competition pool. After they finished that job the pumper and truck moved over and poured the foundations for the two big Air handling units.
The two air handling units will be lifted into place through the opening in the wall and onto the platform. I'll have more pictures of this when we start to put the Air Handling units in place.
That's all for this week. The best of the holidays to you and your families from all of us at North Cowichan.Nuts&Bolts