Good morning,
A short, quick, snowy week! Isn't it spring yet? What's with the snow! Hopefully this is the last hurrah before the weather changes. Well the building is sealed off and we have some heat inside to allow construction to progress. This is especially necessary for the tilers and plumbers who need the heat to do their jobs.
Today the focus is on the wet side of the building. The first photo is the Lap pool full of water. The pool was filled for a leak test at the end of last week. The test completed wednesday and there were no leaks.
This next photo is the wave pool being prepared for a leak test also. The inlets are being installed, the forms are being removed, and the basin cleaned up in preparation for the test.
This photo was taken on thursday. The first water in the wave pool. We are filling from the lap pool and leaving the water in for the weekend. For a nanosecond I considered jumping in, but I put my hand in and realized that I wasn't that brave today. Maybe later....
The final photo today is a ceiling shot. No those aren't bats hanging from he ceiling, they are the lighting fixtures covered to protect them when the ceiling area is painted. Once the ducting, sprinkler system and electrical are completed up there the painters will be in.
Have a good week and stay between the ditches.