I happened to be down at the site this morning so I thought I would fire off a couple of photos of some of the work being done on the exterior of the facility to bring everyone up to speed.
The basic stuff occuring this morning is with the erection of the supporting towers for the waterslide (the large black poles in the pictures) and the exterior cladding of the waterslide stair tower (the red stuff).
No comments:
Post a Comment